
1
/
of
6
Creative+Safety+Supply
Project Planning Dry-Erase Whiteboard 36" x 24"
Project Planning Dry-Erase Whiteboard 36" x 24"
Regular price
$286.20 USD
Regular price
$286.20 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
Overview
- Color : White
- Size : 36" x 24"
- Material : Aluminum, Metal, Vinyl
- Brand : Creative Safety Supply
- Finish Type : Vinyl decal
About this item
- Magnetic Dry-Erase Surface – Vinyl-printed surface resists stains and ghosting for long-term visibility and smooth writing performance
- Easy Installation – Includes mounting brackets and hardware for secure and hassle-free wall mounting
- Durable Aluminum Frame – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
- Usable Writing Surface – Writing area measures 2" less than the board's total dimensions
Share





















